Puerto Escondido Construction
I had reported on March First of my excursion to the top of a luxury hotel to shoot photos of the harbor and town. While there I also took photos of the construction of an addition to the hotel and, particularly, of the use of bricks as form work for construction of the arched window openings.
You can see that a board is placed horizontally at the bottom of the arch and supported by a post. Bricks are then stacked on the board in an arch shape to act as a form for the concrete.
The photos below is of the existing hotel showing the finished arched windows and a couple of fellows installing exterior electrical fixtures.